Coordinated Network Development Plan

As the market area manager, AGGM is fulfilling the obligation stipulated in section 14 (1) (7) GWG, and prepares a Coordinated Network Development Plan (CNDP) every year for a 10-year planning period in coordination with the Austrian transmission system operators and taking into account the long-term planning. It is published upon approval.

The aims of the coordinated network development plan (CNDP) are specifically

  • meeting the demand for line capacity to supply consumers while considering emergency scenarios 
  • ensuring a high degree of availability of line capacity (security of supply of the infrastructure) 
  • covering transport needs 
  • complying with the obligation to meet the infrastructure standard according to Article 6 Regulation (EU) No 994/2010 in the market area.

2019 Coordinated Network Development Plan

Data Acquisition

The capacity scenario for the 2019 Coordinated Network Development Plan was drawn up on the basis of the latest CAM NC survey and agreed with E-Control Austria on 13th of May 2019. Nonbinding capacity demand requests by market participants and announcement of projects by adjacent system operators can be continuously reported to the transmission system operators Gas Connect Austria GmbH (www.gasconnect.at) and Trans Austria Gasleitung GmbH (www.taggmbh.at).

Planning

As part of the planning, projects were developed to provide the requested capacities.

Consultation

The consultation of the 2019 Coordinated Network Development Plan took place in the period from the 7th of October 2019 to the 25thof October 2019.
Please find attached the report of the 2019 Coordinated Network Development Plan edition 1 (edition for the consultation of the Market Area Manager) and the opinions.

Austrian Gas Infrastructure Day

On the Austrian Gas Infrastructure Day (AGID), which took place on 15th of October 2019, the results of the 2019 long term planning  and the 2019 Coordinated network development plan were presented to the market participants. Two guest lectures on the topic of sector coupling have highlighted the future challenges of infrastructure planning.

Approval

It is planned that E-Control Austria will issue the notification for the 2019 Coordinated Network Development Plan at the end of December 2019.

2018 Coordinated Network Development Plan

 E-Control Austria approved the 2018 coordinated network development plan on 20 December 2018 by notice.

The consultation of the 2018 coordinated network development plan took place between 17 October 2018 and 9 November 2018. The consultation version and the opinions are published below:

The results of 2018 the coordinated network development plan were presented to the market participants on the 16 October 2018 as part of the Austrian Gas Infrastructure Development Day (AGIDD).

2014 – 2017 Coordinated Network Development Plan

The coordinated network development plans of the past periods, including the decision of Energie-Control Austria, as well as the presentations are listed in the following table.

 

Decisions 
of the E-Control Austria

Report 
coordinated network development plan

Presentation
Austrian Gas Infrastructure Development Day (AGIDD)

CNDP 2017

Energie-Control Austria notice of 19 January 2018 on the 2017 coordinated network development plan (only german) 

Annex: 2017 coordinated network development plan on the Austrian transmission network during the 2018 –2027 period, edition 4 from 11 November 2017

CNDP17_AGIDD_AGGM
CNDP17_AGIDD_GCA
CNDP17_AGIDD_N4G_Network development
CNDP17_AGIDD_TAG

CNDP 2016

Energie-Control Austria notice of 23 September 2016 on the 2016 coordinated network development plan (only german) 

Annex: 2016 coordinated network development plan on the Austrian transmission network during the 2017 –2026 period
(Per Bescheid am 23. September 2016 genehmigt)

CNDP16_SJWS_MGM
CNDP16_SJWS_GCA
CNDP16_SJWS_TAG
CNDP16_SJWS_ECA

CNDP 2015

Energie-Control Austria notice of 27 October 2015 on the 2015 coordinated netword development plan (only German)
Energie-Control Austria notice of 19 February 2016 on the 2015 coordinated netword development plan (only German)

Annex: 2015 coordinated network development plan on the Austrian transmission network during the 2016-2025 period 
supplement 1 to CNDP 2015_replacement investment
supplement 2 to CNDP 2015_replacement investment

 

CNDP15_SJWS_MGM
CNDP15_SJWS_GCA
CNDP15_SJWS_TAG
CNDP15_SJWS_ECA
CNDP15_SJWS_OGE
CNDP15_SJWS_BNetzA

CNDP 2014

Energie-Control Austria notice of 2 December 2014 on the 2014 coordinated network development plan (only german) 

Annex: 2014 coordinated network development plan on the Austrian transmission network during the 2015 –2024 period

CNDP14_SJWS_MGM
CNDP14_SJWS_GCA
CNDP14_SJWS_BOG
CNDP14_SJWS_TAG
Summary SJWS